RSA Exhibitions

Projects Group were commissioned by our client to design manufacture install and remove a set of exhibition stands across two locations in the UK and one in Europe. Full onsite project management was provided for the duration of the projects co-ordinating with exhibition halls and client requirements.

The brief was a to design an exhibition stand 12m x 8m that would be modular fresh and inviting and could be used at further locations in smaller pieces. The concepts were drawn and revised over a number of weeks before being put into a 5 week production program.

Modular Walls were manufactured in the workshop with 5metre long arches digital screens furniture and graphics and all transported to each site where our team of installers unloaded and erected the completed stands at each location. We provided on site support for any break downs of the digital equipment.

Samsung

We manufactured Samsung’s first fully manned shop at one of Curry’s stores.

One supplier, the complete fabrication and installation in 4 weeks

We were challenged with building a complete premium kitchen that would showcase the connected kitchen brand, be completely interactive and last the test of time. Incorporating staron, veneered timber, LED illumination and acrylic elements we manufactured all the components in house to provide a quick delivery, plug and play installation.

On time every time 

We were approached by Samsung’s agency to produce a large display for all their UK department stores in 10 days. We managed to achieve a tight deadline to the highest standard incorporating an aluminium structure with pre-powder coated trays and brushed stainless steel.

Want it quick 

Samsung required a premium solution to display their new top of the range washing machines in department stores. We manufactured 30 units incorporating Samsung owned staron, fret cut illuminated logo’s, stainless steel and an integrated monitor.

Stand out from the retail crowd

Funko Hamburg

The Renowned creators of the ‘Bobblehead’ figurines approached The Projects Group to create a semi-permanent installation in Hamburg to celebrate their vast range of figures within an existing department store. The Projects Group not only worked with their designers but also produced the entire construction in-house.

Completed within budget and within a tight time frame of 5 weeks, this one of a kind construction was first rendered in three dimensions before working closely with the department store and having a complete knowledge of the electrics of the store. The construction featured LED Fairground bulbs and a unique steel frame working shelf system, balanced by chipboard skin to provide a friendly and approachable feel.

Projects Group knew what made Funko tick and the needs and constraints of the department store too. This was not a case of one client but two with both being extremely satisfied with the result.